Play | Hi Speed transfer rates up to |
---|---|
480Mbps | USB 2 0 A Male to Mini Male 5 Pin |
Cable | ColorBlack |
Length | 10 feet 3 |
Meter | Works |
With | DualShock 3 controller PlayStation 3 PS3 Slim PS3 Move Motion Controller PS3 Move Navigation Controller PS3 Bluetooth Headset PSP 1000 2000 3000 |
Mini USB Cable Compatible with PS3 DualShock 3 Joystick, Move Motion/Navigation Controller, PSP 1000/2000/3000/, Sony PSP, PlayStation 3 / PS3 Slim Charge and Play Extra Long Lead (3m/10ft) Review
Write a review